Project History
Fort Bend County ESD No. 2 Willowfork Administration Bldg & Fire Station 1 Renovation
Admin: 2700 Spring Green Blvd., Katy, TX 77494 | Fire Station 1: 24655 Westheimer Parkway, Katy, TX 77494
Completion Dates: Admin: April 18, 2024 | FS 1: February 16, 2024
Final Contract Amount: $5,931,935
Delivery Method: CMAR
City of Friendswood Blackhawk Emergency Shelter
15355 Blackhawk Blvd., Friendswood, TX 77546
Completion Date: January 29, 2024
Final Contract Amount: $914,000
Delivery Method: CSP
City of Friendswood Blackhawk Renovation
15355 Blackhawk Blvd., Friendswood, TX 77546
Completion Date: January 29, 2024
Final Contract Amount: $5,066,380
Delivery Method: CSP
City of Hitchcock – New City Hall Renovation and Expansion
8102 Highway 6, Hitchcock, TX 77563
Completion Date: December 4, 2023
Final Contract Amount: $1,882,700
Delivery Method: CSP
CSM Warehouse Expansion – Phase 2
8660 Lambright Rd., Houston, TX 77075
Completion Date: September 13, 2023
Final Contract Amount: $1,050,700
Delivery Method: CSP
Brazoria County Facilities Management Warehouse
1340 E. Kiber Rd., Angleton, TX 77515
Completion Date: August 11, 2023
Final Contract Amount: $3,089,900
Delivery Method: CSP
Baytown Utility Services Building
315 W. Texas Ave., Baytown, TX 77520
Completion Date: May 2, 2023
Final Contract Amount: $3,467,695
Delivery Method: CSP
Oyster Creek Wastewater Treatment Plant
474 County Rd. 609, Angleton, TX 77515
Completion Date: April 26, 2023
Final Contract Amount: $420,300
Delivery Method: JOC
Harris County ESD No. 48 – Fire Station 4 Renovation
22855 Franz Road, Katy, TX 77449
Completion Date: February 21, 2023
Final Contract Amount: $989,300
Delivery Method: CSP
Pasadena Municipal Golf Course Maintenance Shed
1000 Duffer Lane, Houston, TX 77034
Completion Date: February 14, 2023
Final Contract Amount: $197,411
Delivery Method: JOC
Brazoria County Historical Museum Westside Renovation
100 E. Cedar, Angleton, TX 77515
Completion Date: February 2, 2023
Final Contract Amount: $293,508
Delivery Method: JOC
Texas Gulf Bank – River Oaks
2517 River Oaks Blvd., Houston, TX 77019
Completion Date: November 18, 2022
Final Contract Amount: $372,700
Delivery Method: Negotiated
Fire Station 4 – Women’s Locker Room Renovation
910 E. Fayle Avenue, Baytown, TX 77520
Completion Date: September 1, 2022
Final Contract Amount: $186,581
Delivery Method: JOC
Barbers Hill Middle School North Girls Athletic Renovations
7579 Eagle Drive, Mont Belvieu, TX 77523
Completion Date: August 1, 2022
Final Contract Amount: $632,615
Delivery Method: CSP
Baytown Animal Services and Adoption Shelter
705 N. Robert C. Lanier Dr., Baytown, TX 77521
Completion Date: July 1, 2022
Final Contract Amount: $6,532,984
Delivery Method: CSP
HCESD 4 Huffman Fire Station 52 Renovations
54 Ivy Leaf Drive, Huffman, TX 77336
Completion Date: June 14, 2022
Final Contract Amount: $534,000
Delivery Method: CSP
Texas Gulf Bank – Freeport
1400 N. Brazosport Blvd., Freeport, TX 77541
Completion Date: February 18, 2022
Final Contract Amount: $1,782,500
Delivery Method: Negotiated
Champions Fire Station 11 Renovation
12730 Champion Forest Drive, Houston, TX 77066
Completion Date: November 15, 2021
Final Contract Amount: $359,700
Delivery Method: CSP
Village Fire Station Additions & Renovations
901 Corbindale Rd., Hedwig Village, TX 77024
Completion Date:
Final Contract Amount: $4,707,600
Delivery Method: CSP
City of Pearland – Orange Street Service Center – Phase 1 Administration Building
3501 E. Orange St., Pearland, TX 77581
Completion Date: October 15, 2021
Final Contract Amount: $5,619,510
Delivery Method: CSP
San Luis Pass Visitor Center
14001 CR 257, Freeport, TX 77541
Completion Date: April 23, 2021
Final Contract Amount: $410,770
Delivery Method: CSP
Missouri City Fire Stations #1, #3 and #4 Renovations
FS #1: 3849 Cartwright; FS #3: 2496 Texas Parkway, FS #4: 5955 Sienna Parkway; Missouri City, TX 77459
Completion Date: January 8, 2021
Final Contract Amount: $317,243
Delivery Method: JOC
EMS Station 97
15600 Woodland Hills Dr., Humble, TX 77346
Completion Date: December 15, 2020
Final Contract Amount: $1,819,000
Delivery Method: CSP
San Jacinto College – Maritime Expansion Fire Training Center
3700 Old Highway 146, La Porte, TX 77571
Completion Date: October 9, 2020
Final Contract Amount: $1,047,600
Delivery Method: CSP
Arcola City Hall Renovations
13222 Highway 6, Rosharon, TX 77583
Completion Date: September 8, 2020
Final Contract Amount: $2,034,000
Delivery Method: CSP
San Jacinto College – South Campus Welcome Center – Bldg 6 Renovation
13735 Beamer Road, Houston TX 77089
Completion Date: August 7, 2020
Final Contract Amount: $419,671
Delivery Method: CSP
Hanson Riverside County Park Re-Development
18499 Hwy 35, West Columbia, TX 77304
Completion Date: June 12, 2020
Final Contract Amount: $459,750
Delivery Method: CSP
Brazoria County Lake Jackson Annex Building
202 Peach Street, Lake Jackson, TX 77566
Completion Date: June 4, 2020
Final Contract Amount: $3,926,500
Delivery Method: CSP
Harris County EMS Stations 92 & 94
92: 1618 Isom, Houston, TX 77039 & 94: 6310 Aldine Bender, Houston, TX 77396
Completion Date: 92 – April 7,2020 | 94 – March 23, 2020
Final Contract Amount: $6,178,460
Delivery Method: CSP
Plus 4 Credit Union – Tomball Branch
9166 FM 2920, Tomball, TX 77379
Completion Date: February 7, 2020
Final Contract Amount: $327,600
Delivery Method: CSP
FCCU Spring Branch Remodel – Phase I & Phase II
9100 Westview Drive, Houston, TX 77055
Completion Date: January 10, 2020
Final Contract Amount: $2,291,000
Delivery Method: CSP
Brazoria County Historical Museum Floor Replacement and New Restrooms
100 E. Cedar, Angleton, TX 77515
Completion Date: December 13, 2019
Final Contract Amount: $293,508
Delivery Method: Cooperative Purchasing, JOC
City of Webster Animal Control Facility
855 Magnolia, Webster, TX 77598
Completion Date: December 10,2019
Final Contract Amount: $866,200
Delivery Method: CSP
Brazoria County Resoft Park Maintenance Shop / Ranger Station
20020 TX-35, Alvin, TX 77511
Completion Date: November 25, 2019
Final Contract Amount: $649,800
Delivery Method: CSP
Brazoria County Camp Mohawk Renovations
110 County Road 193, Alvin, TX 77511
Completion Date: November 25, 2019
Final Contract Amount: $215,241
Delivery Method: Cooperative Purchasing, JOC
City of Webster Police Department Renovation
217 Pennsylvania Ave., Webster, TX 77598
Completion Dated: September 17, 2019
Final Contract Amount: $340,000
Delivery Method: CSP
San Jacinto College – Administration – Restroom Renovation
4624 Fairmont Parkway, Pasadena, TX 77504
Completion Date: August 20, 2019
Final Contract Amount: $580,611
Delivery Method: Cooperative Purchasing, JOC
Baker Ripley Neighborhood Center – Area 1 and Area 2
6500 Rookin St., Houston, TX 77074
Completion Date: Area 1 – August 19, 2019 | Area 2 – August 5, 2019
Final Contract Amount: $96,400
Delivery Method: CSP
Sheldon ISD Compass Schools Upgrades
Carroll E.S, Garrett ES, Monahan ES, Royalwood ES, Sheldon ES
Completion Date: August 1, 2019
Final Contract Amount: $889,138
Delivery Method: CSP
Sheldon ISD Build Back
CE King High School, CE King Middle School, Null Middle School, Royalwood Elementary School
Completion Date: May 30, 2019
Final Contract Amount: $3,616,026
Delivery Method: CSP / JOC
Cy-Fair FCU Copperfield Branch – Remodel
7060 Highway 6 North @ FM 529, Houston, TX 77095
Completion Date: January 23, 2019
Final Contract Amount: $496,877
Delivery Method: CSP
PinnacleART – Phase V
3 Pinnacle Way, Pasadena, TX 77504 & 22 Pinnacle Way, Pasadena, TX 77504
Completion Date: Bldg 3: September 7, 2018 | Bldg 22: October 12, 2018
Final Contract Amount: $4,218,200
Delivery Method: GMP
Delores Fenwick Nature Center
5750 Magnolia St., Pearland, TX 77584
Completion Date: August 16, 2018
Final Contract Amount: $2,535,728
Delivery Method: CSP
ACU – Texas City
1326 9th Avenue N, Texas City, TX 77590
Completion Date: July 23, 2018
Final Contract Amount: $1,337,200
Delivery Method: Negotiated
Houston Federal Credit Union – Kirby Branch – Remodel
3701 Kirby Dr., Suite 120, Houston, TX 77098
Completion Date: March 21, 2018
Final Contract Amount: $236,012
Delivery Method: CSP
Pearland City Hall Complex Renovation
3519 Liberty Dr., Pearland, TX 77581
Completion Date: March 7, 2018
Final Contract Amount: $6,124,000
Delivery Method: CSP
Tom Reid Library Expansion
3522 Liberty Dr., Pearland, TX 77581
Completion Date: February 5, 2018
Final Contract Amount: $3,319,200
Delivery Method: CSP
Associated Credit Union – Alvin – Remodel (new location)
3100 Hwy 35 South, Alvin, TX 77511
Completion Date: September 14, 2017
Final Contract Amount: $195,000
Delivery Method: Negotiated
Cravens ECA & Sheldon ECA Driveway & Canopy Renovations
13210 Tidwell Rd., Houston, TX 77049 / 17010 Beaumont Hwy, Houston, TX 77049
Completion Dated: August 11,2017
Final Contract Amount: $263,525
Delivery Method: Cooperative Purchaing, JOC
Mayde Creek Elementary School and Sundown Elementary School Administration Renovations
2698 Greenhouse Rd., Houston, TX 77084 / 20100 Saums Rd., Katy, TX 77449
Completion Date: August 8, 2017
Final Contract Amount: $1,233,000
Delivery Method: CSP
DISD – Food Nutrition Warehouse
3303 Owens Drive, Dickinson, TX 77539
Completion Date: July 28, 2017
Final Contract Amount: $698,486
Delivery Method: JOC
Heritage Bank – Growth and Lease Spaces Build-out
85 Oak Drive, Lake Jackson, TX 77566
Completion Date: March 8, 2017
Final Contract Amount: $295,502
Delivery Method: CSP
Heritage Bank – Lake Jackson
85 Oak Drive, Lake Jackson, TX 77566
Completion Date: February 3, 2017
Final Contract Amount: $2,315,791
Delivery Method: CSP
ACU Brenham – Disaster Recovery Center
2509 Becker Dr., Brenham, TX 77833
Completion Date: December 22, 2016
Final Contract Amount: $640,800
Delivery Method: CSP
Traylor Office Building
2651 Douglas St., Pearland, TX 77581
Completion Date: December 13, 2016
Final Contract Amount: $861,000
Delivery Method: Negotiated
San Jacinto College North – Baseball Facility
5800 Uvalde Rd., Houston, TX 77049
Completion Date: October 25, 2016
Final Contract Amount: $622,648
Delivery Method: CSP
Nottingham Country Elementary – Life Skills Remodel
20500 Kingsland Blvd., Katy, TX 77450
Completion Date: August 2, 2016
Final Contract Amount: $375,818
Delivery Method: Cooperative Purchasing, JOC
Associated Credit Union – Deer Park – Remodel
309 West X Street, Deer Park, TX 77536
Completion Date: June 28, 2016
Final Contract Amount: $768,545
Delivery Method: CSP
Westbound Bank – Conroe Branch
244 S. Loop 336 W, Conroe, Texas 77304
Completion Date: February 9, 2016
Final Contract Amount: $1,173,000
Delivery Method: CSP
Brazosport College Welding Center/Canopy
500 College Drive, Lake Jackson, Texas 77566
Completion Date: January 12, 2016
Final Contract Amount: $3,730,000
Delivery Method: CSP
Grisby Office Facility
14333 Grisby Rd., Houston, Texas 77079
Completion Date: February 23, 2016
Final Contract Amount: $796,000
Delivery Method: CSP
Westbound Bank – 529 Branch
15001 FM 529, Houston, Texas 77095
Completion Date: December 28, 2015
Final Contract Amount: $1,149,307
Delivery Method: CSP
Brazoria County Sheriff’s Office
3602 County Road 45, Angleton, Texas 77515
Completion Date: March 13, 2015
Final Contract Amount: $155,317
Delivery Method: Cooperative Purhasing, JOC
Max Road Sports Complex – Phase I
7600 Hughes Ranch Road, Pearland, Texas 77581
Completion Date: August, 27, 2015
Final Contract Amount: $2,967,075
Delivery Method: CSP
PinnacleART – Phase 3
5050 Strawberry Road, Pasadena, Texas 77504
Completion Date: July 23, 2015
Final Contract Amount: $1,531,894
Delivery Method: GMP
Brazoria County Sub Office
3633 CR 58, Manvel, Texas 77578
Completion Date: November 1, 2014
Final Contract Amount: $2,429,100
Delivery Method: CSP
PinnacleART – Phase 2
5050 Strawberry Road, Pasadena, Texas 77504
Completion Date: January 1, 2015
Final Contract Amoutn: $2,978,375
Delivery Method: GMP
League City Booster Pump Station
League City, Texas 77573
Completion Date: June 18, 2014
Final Contract Amount: $1,186,000
Delivery Method: CMR
Associated Credit Union – Cypress
7640 Fry Road, Cypress, Texas 77587
Completion Date: June 1, 2014
Final Contract Amount: $1,166,409
Delivery Method: CSP
NCI – Workforce Solutions
13148 Gulf Freeway, Houston, Texas 77034
Completion Date: May 16, 2014
Final Contract Amount: $615,130
Delivery Method: GMP
Integrity Bank – Pasadena
6025 Crenshaw Road, Pasadena, Texas 77505
Completion Date: October 2013
Final Contract Amount: $1,720,000
Delivery Method: CSP
Creekside Crossing Retail Center
4420 W. Main Street, League City, Texas 77573
Completion Date: February 2014
Final Contract Amount: $863,400
Delivery Method: Negotiated
Integrity Bank – The Woodlands
1699 Research Forest Dr., Shenandoah, Texas 77381
Completion Date: June 1, 2013
Final Contract Amount: $527,700
Delivery Method: CSP
Westside Library
2803 Business Center Dr., Suite 101, Pearland, Texas 77584
Completion Date: April 2013
Final Contract Amount: $375,000
Delivery Method: CSP
Pearland ISD – Turner Renovations
4717 Bailey Road, Pearland, Texas 77581
Completion Date: March, 2013
Final Contract Amount: $251,861
Delivery Method: Cooperative Purchasing, JOC
South Main Baptist Church Renovations
4300 E Sam Houston Pkwy S, Pasadena, Texas 77505
Completion Date: October 2012
Final Contract Amount: $1,357,697
Delivery Method: CMR
MidSouth Bank – Magnolia
6311 FM 1488, Magnolia, Texas 77354
Completion Date: June 1, 2013
Final Contract Amount: $248,792
Delivery Method: Negotiated, GMP
First Community Credit Union – The Woodlands
3601 FM 1488, The Woodlands, Texas 77384
Completion Date: May 1, 2013
Final Contract Amount: $105,070
Delivery Method: CSP
MidSouth Bank – Veterans
11417 Veterans Dr., Houston, Texas 77067
Completion Date: January 2013
Final Contract Amount: $198,134
Delivery Method: CSP
Texas Gulf Bank – West University
5600 Kirby Dr., Suite S1, Houston, Texas 77005
Completion Date: January 2013
Final Contract Amount: $342,869
Delivery Method: CSP
Southwest Water Reclamation Facility
1220 S. Maple Leaf Dr., League City, Texas 77511
Completion Date: May 2012
Final Contract Amount: $2,561,593
Delivery Method: CMR
Northwest Pines
14022 Walters Road, Houston, Texas 77014
Completion Date: September 2012
Final Contract Amount: $957,157
Delivery Method: GMP
Texas Gulf Bank
1005 S. Friendswood Dr., Friendswood, Texas 77546
Completion Date: January 2012
Final Contract Amount: $1,411,728
Delivery Method: CSP
Pinnacle AIS
5050 Strawberry Road, Pasadena, Texas 77504
Completion Date: January 2010
Final Contract Amount: $1,229,962
Delivery Method: GMP
Manvel EMS
6931 Masters Road, Manvel, Texas 77578
Completion Date: November 2010
Final Contract Amount: $1,542,398
Delivery Method: CSP
Associated Credit Union Headquaters
1095 W. League City Parkway, League City. Texas 77573
Completion Date: February 2009
Final Contract Amount: $6,137,582
Delivery Method: GMP
San Jacinto College Child Care School
8060 Spencer Hwy, Pasadena, Texas 77504
Completion Date: April 2010
Final Contract Amount: $2,900,000
Delivery Method: CSP
Associated Credit Union – Santa Fe
11934 FM 1764, Santa Fe, Texas 77510
Completion Date: November 2009
Final Contract Amount: $1,247,323
Delivery Method: GMP
San Jacinto College Kitchen Renovations
South Campus; Central Campus
Completion Date: January 2011
Final Contract Amount: $948,248
Delivery Method: Cooperative Purchasing, JOC
Urology of Houston
3230 Strawberry Road, Pasadena, Texas 77504
Completion Date: March 2010
Final Contract Amount: $1,800,000
Delivery Method: CSP
Brazoria County Commissioner’s Office
2508 N. Gordon Street, Alvin, Texas 77511
Completion Date: February 2009
Final Contract Amount: $2,575,830
Delivery Method: CSP
Texas Gulf Bank Renovations I & II
203 This Way, Lake Jackson, Texas 77566
Completion Date: April 2011
Final Contract Amount: $213,984
Delivery Method: GMP
Brazoria County Justice of the Peace
3801 E. Pear St., Pearland, Texas 77581
Completion Date: November 2009
Final Contract Amount: $850,000
Delivery Method: CSP
Slocomb Fine Arts Wall Repair
8060 Spencer Hwy, Pasadena, Texas 77504
Completion Date: February 2013
Final Contract Amount: $125,673
Delivery Method: Cooperative Purchasing, JOC
City of Alvin PSF Buildout
1100 W Hwy 6, Alvin, Texas 77511
Completion Date: February 2013
Final Contract Amount: $96,661
Delivery Method: Cooperative Purchasing, JOC
Barnes and Noble College Bookstores
San Jacinto College – Central Campus; Pasadena, Texas
Lamar University; Beaumont, Texas
TAMU, San Antonio; Texas
Ohio State University; Columbus, Ohio
University of Houston; Sugarland, Texas
University of Houston – Calhoun Lofts; Houston, Texas
Lamar State University; Port Author, Texas
Ball State University; Muncie, Indiana
Nazareth University; Rochestor, New York
Community College of Philadelphia; Philadelphia, Pennsylvania
University of Arkansas – Fort Smith; Fort Smith, Arkansas
Hendrix College; Conway, Arkansas
Austin Community College; Round Rock, Texas
Wharton County Community College Fort Bend Tech Center – Richmond, Texas
Wharton County Community College Memorial Union – Wharton, Texas
Rowan University – Glassboro, New Jersey
University of Sciences – Philadelphia, Pennsylvania
Yale University, New Haven Connecticut
Lousiana Tech – Rustan, Lousiana
Emporia State University – Emporia, Kansas